Overview

Quick Details

Place of Origin:

Zhejiang, China

Brand Name:

EPT

Model Number:

WEA25

Material:

50Mn

Application:

Solar Power System

Product name:

Solar Mounting Bracket

Color:

Natural

Certificate:

ISO9001:2015

Installation Site:

Open Field

Name:

Slewing drive

Motor:

DC/AC/Hydraulic motor

Weight:

202KG

Warranty:

1 Year

Supply Ability

Supply Ability:
1500 Set/Sets per Month

Packaging & Delivery

Packaging Details
foam spacer loaded in wooden box
Port
Lianyungang/Shanghai
Picture Example:

Lead Time
:
Quantity(Sets) 1 – 5 >5
Est. Time(days) 20 To be negotiated

Online Customization

Video Description

Big Size Single Axis For Mining Machine Slewing Drive WEA25-150-H-25R

Jiangsu shuangzheng Machinery Co.,ltd is a professional manufacturer and exporter of slewing bearing/slewing ring/slew circle, slewing drives/slew drive, which are mainly applied in port machinery, mining machinery, welding machinery, construction vehicles, modular vehicles, single or dual axis solar tracking systems, and small wind power systems etc.

SE SERIES
Model Rated Output Torque(kN.m) Tilting Moment Torque(kN.m) Axial Load(kN) Radial Load(kN) Holding Torque(kN.m) Weight(KG)
SE3 0.4 1.1 30 16.6 2 14
SE5 0.6 3 45 22 5.5 13
SE7 1.5 13.5 133 53 10.4 23
SE9 6.5 33.9 338 135 38.7 50
SE12 7.5 54.3 475 190 43 65
SE14 8 67.8 555 222 48 70
SE17 10 135.6 970 390 72.3 105
SE21 15 203 1598 640 105.8 180
SE25 18 271 2360 945 158.3 218
WEA SERIES
Model Rated Output Torque(kN.m) Tilting Moment Torque(kN.m) Axial Load(kN) Radial Load(kN) Holding Torque(kN.m) Weight(KG)
WEA9 8 33.9 550 205 38.7 53
WEA12 9.5 54.3 725 270 43 66.8
WEA14 10.8 67.8 920 343 48 75
WEA17 12.96 135.6 1110 414 72.3 96
WEA21 28.7 203 1595 596 105.8 172
WEA25 34.2 310 1850 690 158.3 202

FAQ

1.You are a trader or a manufacture?

We are an industry and trade integration business, our factory located on Xuzhou City.

2.How about the payment terms?

We usually accept T/T or L/C. other terms also could be negotiated.

3.What is your minimum order?

It depends on what you are buying. Normally, our minimum order is 1pc.

4.What is your delivery time?

If there are any parts in stock , our delivery time is only 3-7 days. If our standard model,the delivery time is around 25days,if non-standard model,the delivery time is 45~50 days.

5.What about Quality Control?

We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.