General Description
This energy unit features a long term magnet motor with a power up gravity down circuit. Activate the start out solenoid to begin the motor to lift the machine. The lowing movement is activated from the solenoid valve with all the reducing speed controlled through the pressure compensated movement control valve. Goods of this series might be broadly used in the business of logistic gadgets such as fork lift, mini lift table, and so forth.
Special Notes
one. This electrical power unit is of S3 duty cycle, i.e.,non-continuous operation, 30 seconds on and 270 seconds off.
2. Clean the many hydraulic elements concerned ahead of set up of the electrical power unit.
three. Viscosity on the hydraulic oil shoud be 15~46 cst, which must also be clean and cost-free of impurities. N46 hydraulic oil is recommended.
4. This energy unit is intended to be mounted vertically.
five. Check the oil degree while in the tank after the very first star from the electrical power unit.
six. Oil shifting is required soon after the first a hundred operation hours,afterwards when just about every 3000 hrs.
7. More pump sizes and tank sizes are avaiable on request.